What does it mean if there are "2 task iterations"?

In case the context for this is relevant, I assigned a project to a translator that downloaded the file, translated it in their own Studio offline, and then uploaded the completed translation back. In the file history it does show "Import" and "Translation" steps. However, when I download the V6 Translation file, it still shows only the source language with the target language completely blank.

See screenshots below. 

Trados Studio project dashboard showing two translation tasks with one highlighted, indicating a possible issue with task iterations.Detailed view of Trados Studio file history with steps including 'Copy Source to Target', 'Translation Memory Matching', 'Bilingual Engineering', 'Translation', 'Import', and 'Translation' marked as done.



Generated Image Alt-Text
[edited by: Trados AI at 7:31 AM (GMT 0) on 5 Mar 2024]